简历技巧

sap顾问简历

时间:2022-10-06 04:33:23 简历技巧 我要投稿
  • 相关推荐

sap顾问简历

大学生简历网(www.yJsJl.org)为您提供以下文章:个人简历样本下载    个人简历的样本、仅供参考

sap顾问简历

大学毕业生求职简历          机械类求职简历          医学类求职简历       毕业生求职简历         求职简历样本下载

个人基本信息

姓名 任先生 性别 出生年月 0年0月0日
学历 本科 专业 信息管理和信息系统 毕业学校  
工作年限 九年以上 现居住地: 北京    

简历摘要
huai-yu ren (mr.)
mobile : 13601******

professional summary

6 years sd/wm consultant, 10 years it experience, 6 years logistics and operation management experience; familiar with electronics and electrical engineering industry, proficient in project planning and designing.

extensive experiences in system integration between sap and multi-model and systems, such as pdm 、 shopflow 、 b2b 、 wm 、 the client forwarder as well as customs systems, and being the project manager for quite a few projects.

proficient in the webmethods eai platerrorform and idoc, as well as the production and logistics operation procedures of electronics industry level 6-10.

proficient in sap sd/wm model; completed 7 full cycle projects independently ; strong interpersonal communication skills and consulting ability, maintaining a good relationship with clients; a thorough understanding on every sap project implementation procedures as well as an acute insight in implementation mythology in asap.

relevant engagements and projects

mcsg cellphone manufacturing domestic sales project (03/2009 – 10/2009)
project profile: a domestic sales project was added to the original single export, basing on the mutual agreement between foxconn and its client. the project needs to deal with two products: domestic sales cell phones and package materials, as well as to handle different order processes, to maintain the same project pace with client. involving models of sd, mm, pp,wm and systems of b2b and shop flow, the project requires to fulfill the errorobjectives of the project at the scheduled time without affecting the original order process(several billion us dollar order flow). location: beijing .
models and systems involved : sd , mm, pp,wm, b2b , shop flow
responsibilities: act as project manager and sd consultant. responsibilities are as below:
1) doing research and drafting conference briefs, analyzing and discussing current processes
2) discussing and designing project blueprint
3) coordinating system development and configuration, unit testing
4) testing scenario building and integration testing
5) e2e testing with client, and client’s forwarder
6) coordinating for the system go-live and pilot run

project: braizil bts order project(10/2008 – 03/2009)
project profile: our client required us to produce its products in advance for some of its customers, namely the client signed a paper contract with our brazil branch and basing on this paper contract, we did raw material purchases and produced client’s products; and when the client’s customers got their respective orders, we would adopt the b2b system to deliver products according to these orders. the processes and operations involved in this project include sd new order process, pp new production order process, mrp 0peration, shop flow system and b2b system, as well as the special solution of sap to brazil : nf-e finance and taxation system. location: brazil models and systems involved: sd,mm,pp .,b2b,shopflow,fi
responsibilities: act as an is/it contact window, sd consultant. responsibilities are as below :
1) offering consulting advices on the overall system solutions and discussing project schedules with client
2) analyzing and discussing the current procedure
3) p roviding professional advice on the future business procedures
4) designing part of sd new orders and carrying on unit testing
5) drafting user manual and executing integration testing
6) coordinating system go-live and pilot run

mcsg finished-goods e-warehouse system for one business unit project (08/2008 – 10/2008)
project profile: adopting e-warehouse system to optimize warehouse management, this project realized the automation stock-in, bar code label printing and extracting product weight and volume data in the shop flow system, facilitating the management of sd delivery stage. location: beijing .
models and systems involved: wm , sd , shop-flow, b2b
responsibilities: act as project manager, sd consultant. responsibilities are as below:
1) communicating with business users and executing is/it inner coordination
2) evaluating project system design, analyzing and estimating risk, planning schedule as well as planning and assigning of resources
3) integration testing and user manual drafting
4) professional training to sap key users
5) coordinating system go-live and pilot run

foxconn beijing entity split and sap system go-live project (03/2007– 03/2008)
project profile: due to business development , our company was needed to be splitted into two companies in order to facilitate operation of certain clients. the splitted two companies were needed to carry out sap system go-live and data cut-over. being a natural cut-over, the cut-over took a comparatively longer time; besides, because the export license of the newly-splitted company was not granted, the project was not accomplished until march, 2008. this project adopted the cross-company transaction model. while engaging in this project, i also took part in some other projects. location: beijing .
models and systems involved: sd , mm,pp,fi,co, shop flow , b2b
responsibilities: act as a sd leader. responsibilities are as below:
1) doing researches and drafting conference briefs
2) analyzing and discussing current processes
3) providing professional advice on future business blueprint
4) making function manual for abap development
5) unit testing.
6) user manual drafting
7) data collecting
8) development function testing
9) system integration testing
10) end user training

foxconn(langfang) first stage go-live- sap project (06/2007 – 11/2007)
project profile: with the investment of $1.2 billion, the foxconn(langfang branch) has 80,000 personnel. the sap go-live implementation involves three business units and 10 different categories of factories. location: langfang
models and systems involved: sd , mm,pp,fi,co,b2b , vmi
responsibilities: act as an sd consultant. responsibilities are as below :
1) doing researches and drafting conference briefs
2) analyzing and discussing current processes
3) providing professional advice on future business blueprint
4) system configuration and unit testing
5) user manual drafting
6) data collecting
7) development function testing
8) system integration testing
9) data transfer and job role authorization assignment
10) end user training and coordinating system go-live and pilot run

mcsg globalization of one business unit in foxconn - sap project (08/2006 – 03/2007)
project profile: firstly, company built a production line for complete sets of cellphone in beijing and decided the production model of bto, and then, this model was consequently copied by sites at mexico , brazil , india and shenzhen longhua, etc. models and systems involved : sd , mm,pp,fi,co,b2b , shop flow
responsibilities: act as external system development project manager, sd leader. responsibilities are as below:
1) doing researches and drafting conference briefs
2) analyzing and discussing current processes
3) providing professional advice on future business blueprint
4) system configuration and unit testing
5) user manual drafting
6) development function testing
7) system integration testing
8) job role authorization assignment
9) coordinating system go-live and pilot run

foxconn(yantai) go-live - sap project (04/2006 – 08/2006)
project profile: a component production base was built in yantai, with two business units carrying out sap go-live.
models and systems involved: sd , mm,pp,fi,co,b2b , shop flow
responsibilities: act as a sd consultant. responsibilities are as below:
1) doing researches and drafting conference briefs
2) analyzing and discussing current processes
3) providing professional advice on future business blueprint
4) system configuration and unit testing
5) user manual drafting
6) development function testing
7) system integration testing
8) job role authorization assignment
9) end user training
10)coordinating system go-live and pilot run

foxconn( beijing ) business unit spliting go-live - sap project (02/2006 – 04/2006)
project profile: the original two business units were splitted into four business units. data was splitted immediately.
models and systems involved : sd , mm,pp,fi,co,b2b , shop flow
responsibilities: act as a sd consultant. responsibilities are as below:
1) doing researches and drafting conference briefs
2) analyzing and discussing current processes
3) providing professional advice on future business blueprint
4) system configuration and unit testing
5) user manual drafting
6) add-on development function testing
7) system integration testing
8) job role authorization assignment
9) end user training
10) coordinating system go-live and pilot run

foxconn( beijing )maintenance - sap project (10/2003 – 02/2006)
project profile: maintenance of mpeg mcsg in beijing .
responsibilities: act as a sd consultant. responsibilities are as below:
1) solving problem occurred
2) printing report design
3) stage user training
4) analyzing reerrorforming needs of procedures and testing

education and professional certificates
degree: bachelor university: harbin engineering university
english: cet-6
certificates: engineer
industrial statistician 
 

大学应届毕业生求职信   求职信   求职个人自荐信模板   大学教师自我鉴定

 

下载空白个人简历表   应聘简历   推荐个人简历   空白个人简历   会计的简历

【sap顾问简历】相关文章:

顾问简历10-07

顾问专业简历10-26

顾问简历范文10-09

置业顾问简历10-07

销售顾问简历10-06

法务顾问求职简历10-05

业务顾问专业简历10-06

咨询顾问简历模板10-05

促销顾问简历模板10-09

销售顾问简历模板10-26